Recent Posts

Pages: 1 2 3 4 5 [6] 7 8 9 10
51
Buildings / Re: Marriott Marquis Masonville
« Last post by Estro on November 16, 2025, 11:43:06 am »
None of the links work.
52
Buildings / Re: Block R193 in Pokemon City (Communist style Mish-Mash Block)
« Last post by Estro on November 16, 2025, 11:12:43 am »
For some odd reason, the download link has been down for some time now and I didn't realize this until today. On a brighter note, the broken link has been replaced with a fully working one. Have fun!
53
Integration Projects / Re: g-ElevIntegration
« Last post by liftfilmer124 on November 10, 2025, 02:36:24 am »
What're the elevator cabs gonna be? Do you have textures for them?
54
Integration Projects / Re: g-ElevIntegration
« Last post by g-Elevators on November 05, 2025, 08:38:09 pm »
Update: November 5, 2025
Shafts started
The floors for both buildings and their columns are now complete, and a few columns were also moved. I have also started work on the shafts of the "core" section of the Seashell Building, by adding the cuts for the shaftworks, but none of the stairwells are started yet. This "core" section includes the service elevators, all three hotel elevator banks (L, 22 express, 22-30, and 22, 33-40), and two stairwells. Coming up, I will complete the aforementioned shaftworks and start on the remaining shaftworks (L, 41-42 observation express, L-5 conference, L, 6-11 office, L, 14-20 office, and L-5 Sandbar Wing) and all four stairwells.
To-do (structural):
- Columns: Done
- Floors: Done
- Interfloor: Making good progress
- Elevators: Barely started
- Stairwells: Not started
Screenshots:
https://imgur.com/nVLxtLY
https://imgur.com/UeO5gqY
https://imgur.com/INWwVjw
https://imgur.com/tWawnzh
https://imgur.com/UUOQ4Ku
55
Integration Projects / Re: Extreme MEGAProjects
« Last post by Skyscraper Simulator Showcase on November 04, 2025, 06:01:10 pm »
Why is it that the parking garage elevators in Pyramid Plaza have extremely short door timers (1.5 seconds instead of the default 5 seconds)?

The Westy will close when it wants to close!
56
Download Skyscraper Simulator / Re: New build: 9/24/25 build
« Last post by QuarioQuario54321 on November 04, 2025, 02:26:13 pm »
A minor feature I'd like to see: being able to set the door speed in the elevator editor
57
Integration Projects / Re: Extreme MEGAProjects
« Last post by liftfilmer124 on November 04, 2025, 12:53:33 am »
Why is it that the parking garage elevators in Pyramid Plaza have extremely short door timers (1.5 seconds instead of the default 5 seconds)?

I think it's to reflect how impatient Westinghouse elevators are. They're known for having annoyingly short door timers.
58
Integration Projects / Re: Extreme MEGAProjects
« Last post by QuarioQuario54321 on November 03, 2025, 03:47:34 pm »
Why is it that the parking garage elevators in Pyramid Plaza have extremely short door timers (1.5 seconds instead of the default 5 seconds)?
59
Data / HITACHI Elevator Japanese Chime
« Last post by espresso on November 01, 2025, 12:56:19 am »
https://www.youtube.com/watch?v=H8k187V1mso
https://www.youtube.com/watch?v=BVgqv9th1OQ

This chime is transmitted from a new Hitachi elevator in Japan.
Pages: 1 2 3 4 5 [6] 7 8 9 10