Author Topic: Stair placement with labeling  (Read 248 times)

Offline chuhei

  • General Member
  • Posts: 32
  • I should be the wielder.
  • Location: HONG KONG
    • View Profile
    • My videos
Stair placement with labeling
« on: September 14, 2021, 12:53:19 pm »
Labeling is based on glass tower
While stair placement is by trial and error.

Now we have four options to use, please visit the second tower for the fun.

I was planning to construct a new block. Before I do that, I have to solve face of stair and face of elevator first. I just basically solved stair problem, as we need front back.

I generally have solved one problem about stairs, the transformation is nearly headache, it works.

https://drive.google.com/file/d/1cVp4vQxSlU_p_MIO3hTfV1lfvSIcL_ZB/view?usp=sharing


Before going bed, at least I have figured front-back. The two shows perfect so I can do better design.
 
Roma does not take one day to build

Share on Facebook Share on Twitter

Useful Useful x 1 View List

Offline NothingCanStopMe357

  • Contributor Level I
  • *
  • Posts: 172
  • Contributor to SSF. Innovation is key to success.
  • Location: Multiple places. Usually Scratchland and Skyscrapersimcity
    • View Profile
    • My Scratch Account
Re: Stair placement with labeling
« Reply #1 on: July 28, 2022, 07:47:06 pm »
I’m aware this is an old topic but the link no longer works
Together, we can innovate Skyscrapersim in many ways that has never been seen before. Just bring up an idea and we can implement it!

Offline chuhei

  • General Member
  • Posts: 32
  • I should be the wielder.
  • Location: HONG KONG
    • View Profile
    • My videos
Re: Stair placement with labeling
« Reply #2 on: August 31, 2022, 03:08:11 am »
Although the link is no longer valid. It is said, people can create theirs if they read Ryan's enough. Of course, Your work might be speeding up my building progress. Just remember adding cutoff at where stair placed so, I can no longer need atrium, or using that being as VOID.
Roma does not take one day to build