Poll

Ideas for the next building project (post-Build 3 g-ElevIntegration)

No building at all.
0 (0%)
A Simple building modification.
0 (0%)
A version 2 of the Himmelstor Hospital (a building by a user named "PostTower").
8 (22.9%)
A continuation of Teknikk Plaza (a HeisTeknikk building) out of pre-release (the project was abandoned by HeisTeknikk before the building came out of pre-release in the first place).
9 (25.7%)
An improved version of the Glass Tower (a building from the Towering Inferno modeled by eventhorizon).
4 (11.4%)
A heavy modification to the original version of Skyscrapersim Housing Estate - Section 3 (a ttskyscraper/Mn10 building).
2 (5.7%)
A heavy modification to the original version of Transnational Office Plaza (a Mn10 building).
1 (2.9%)
Starting from scratch, a version 8 of Veranda Plaza (an Andreas - HT building).
0 (0%)
Starting from scratch, a new Embassy Suites hotel in escalatorgeek881's city of Andersville.
5 (14.3%)
Starting from scratch, a new convention center named Elderville Convention Center, with the creation of the fictional town Elderville, MI, which it will be located in.
6 (17.1%)

Total Members Voted: 35

Author Topic: g-ElevIntegration  (Read 36255 times)

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #45 on: August 21, 2024, 04:29:06 pm »
Update: August 21, 2024
Offices starting
I am starting to work on the office floors. Three of the offices for floors 11-15 have been made, and the carpeting has been changed. Next up, I will work on adding the remaining offices for floors 11-15, add restrooms (left of the stairwell), and add walls around the stairwell and elevator shaft. Here are some screenshots of my progress (all are on floor 15).



« Last Edit: August 21, 2024, 04:31:34 pm by g-Elevators »
Like Like x 3 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #46 on: August 22, 2024, 09:07:59 pm »
Update: August 22, 2024
Major progress on offices
I have got all of the remaining offices added (on floors 11-15) and added some of the walls around the elevator shaft and all of the walls around the stairwell (on all office floors). I have also shifted the front office wall, aligning it with the window texturing and enlarging the offices slightly. Next coming, I will finish the elevator shaft walls and add the restrooms. I will also assign each office a number with the format FF-N, where FF is the floor number and N is the sequential office number. For example, office 3 on floor 12 would be assigned the number 12-3. Here are some screenshots of my progress (again, all are on floor 15).








Like Like x 1 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #47 on: August 23, 2024, 07:51:35 pm »
Update: August 23, 2024
Elevators now fully complete
I have completed the walls around the elevator shaft on all office floors, and removed the trims from the black granite walls, due to interfering with entering the elevators. I have also made some preparations for adding the restrooms. The elevators can now be declared "fully complete" rather than "partially complete", because there is no more work I got to do on them. Please Note: The work on actually adding the restrooms and the office numbering (including office signage) has been postponed until tomorrow, because I didn't feel like doing them today, for some reason. Here is a screenshot of my progress.
« Last Edit: August 23, 2024, 07:53:10 pm by g-Elevators »
Like Like x 2 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #48 on: August 24, 2024, 10:05:55 pm »
Update: August 24, 2024
Restrooms and door trims
I have added the restrooms, standardized all of the door and window trims (including the elevator and stairwell door trims on all office floors, 11-19), and added wood flooring in front of the elevators on floors 11-15. Next up (moved to tomorrow), I will get the office numbering (including signage) in and complete the restrooms. After that's done, I will start working on office floors 16-19. Here are some screenshots of my progress (again, all are on floor 15).


« Last Edit: August 24, 2024, 10:10:34 pm by g-Elevators »
Agree Agree x 2 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #49 on: August 25, 2024, 07:19:01 pm »
Update: August 25, 2024
Floors 11-15 complete
I have just fully completed the first set of office floors, as the restrooms are now complete (with custom doors) and the office numbering and signage is added now. In addition, I added signage for the stairwell on all office floors. Coming up, I will start working on office floors 16-19. Here are some screenshots of my progress.



Like Like x 1 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #50 on: August 26, 2024, 05:28:08 pm »
Update: August 26, 2024
One, Fell, Swoop.
I have finished the office floors 16-19, in one fell swoop, as I simply copy, pasted, and modified the code, to add everything on those floors. Next, I may start improving the external windows with custom mullions. I also put up a poll for ideas of things to add in the two atriums. I will lock the poll on October 5, 2024, and see the results. I will do the one with the most votes. Here are some screenshots of my progress.








« Last Edit: August 26, 2024, 05:39:08 pm by g-Elevators »
Like Like x 1 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #51 on: August 28, 2024, 06:15:36 pm »
Update: August 28, 2024
Mullions "started"
I have started work on a function that allows for mullions and custom windows, although it cannot be used yet (it does not work as a function), hence the quotes around the word. Next up, I will finish work on the function, test it out, and actually start adding the windows (once the function is perfected). No screenshots need to be made, as the actual building is still in the state that it was the last time I posted screenshots.
Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #52 on: August 29, 2024, 07:34:59 pm »
Update: August 29, 2024
Function is working
I have made a bunch of progress on the function, and it is now usable (but only for front-facing windows). I have already added one window to test out the function. Coming next, I will add support for windows of all directions in the function, and then actually add the windows (with a For loop, if possible). Here is a screenshot of my progress.
« Last Edit: August 29, 2024, 07:37:20 pm by g-Elevators »
Like Like x 1 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #53 on: August 30, 2024, 09:53:49 pm »
Update: August 30, 2024
Custom mullions/windows added
I have added the custom windows, which feature mullions, window frames, alpha blending on the exterior of the window pane, are made using a function, and are added using For loops. When I return, I will finish up the work that was necessitated by adding these custom windows, like adding wall boxes on each corner (using the same texture as the mullions), retexturing transition cover walls on the interior of the atriums, and thickening and retexturing the transition roofs to match the mullions. Here are some screenshots of my progress.








Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #54 on: August 30, 2024, 09:57:25 pm »
Notice: August 30, 2024
I will be pausing work on this IP for about a week, before I restart.

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #55 on: September 11, 2024, 04:45:53 pm »
Notice: September 11, 2024
Work on this IP will restart now.
Like Like x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #56 on: September 12, 2024, 04:26:18 pm »
Notice: September 12, 2024
There has been progress made on the building, but it has and will be slow due to having to focus on other tasks as well.
Like Like x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #57 on: September 14, 2024, 12:09:47 am »
Update: September 13, 2024
Mullions complete, except around entrance
I have completed most of the custom windows and mullions, except for ones around the entrance doors. I have also retextured the transition covers in the atriums, and changed the texture of the machine room walls (on the roof) to somewhat match up with the new roof texture. Next up, I will add the missing mullion, realign the doors to fit with them, and also add a canopy over the doors. Here are some screenshots of my progress.


Like Like x 1 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #58 on: September 18, 2024, 12:28:04 am »
Update: September 17, 2024
Mullions fully complete!
I have just finished, completely, the mullions, with the final piece, the entrance doors, now completed, with the overhang above the doors added. After this, I will add some more extra details here and there (when I have time on my hands), and add what the winner is in the poll above (once I lock the poll on October 5). Vote in the poll now! Note: Choosing the fifth option requires that you make a post in this topic. Here is a screenshot of my progress.
« Last Edit: September 18, 2024, 12:33:03 am by g-Elevators »
Like Like x 1 Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #59 on: September 29, 2024, 11:59:32 pm »
Update: September 29, 2024
New round columns
I have added new round columns onto the elevator bank and stairwell as an extra detail, using a new geometry feature in the latest build of SkyscraperSim, the 9/28 build. Next up, more detail work on the elevators will be done. Here are some screenshots of my progress.



« Last Edit: September 30, 2024, 12:01:37 am by g-Elevators »
Like Like x 1 Agree Agree x 1 View List