Poll

Ideas for the next building project (post-Build 3 g-ElevIntegration)

No building at all.
0 (0%)
A Simple building modification.
0 (0%)
A version 2 of the Himmelstor Hospital (a building by a user named "PostTower").
8 (22.9%)
A continuation of Teknikk Plaza (a HeisTeknikk building) out of pre-release (the project was abandoned by HeisTeknikk before the building came out of pre-release in the first place).
9 (25.7%)
An improved version of the Glass Tower (a building from the Towering Inferno modeled by eventhorizon).
4 (11.4%)
A heavy modification to the original version of Skyscrapersim Housing Estate - Section 3 (a ttskyscraper/Mn10 building).
2 (5.7%)
A heavy modification to the original version of Transnational Office Plaza (a Mn10 building).
1 (2.9%)
Starting from scratch, a version 8 of Veranda Plaza (an Andreas - HT building).
0 (0%)
Starting from scratch, a new Embassy Suites hotel in escalatorgeek881's city of Andersville.
5 (14.3%)
Starting from scratch, a new convention center named Elderville Convention Center, with the creation of the fictional town Elderville, MI, which it will be located in.
6 (17.1%)

Total Members Voted: 35

Author Topic: g-ElevIntegration  (Read 36255 times)

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #105 on: August 29, 2025, 07:40:55 pm »
Release: August 29, 2025
g-ElevIntegration Build 3
Download - Full release build
Download - Patch build

Instructions:
Note: the latest build of the EG881 Integration Project must be downloaded first before you download g-ElevIntegration, and the patch build requires Build 2 to be installed.
Click "Download" to download the release. It will automatically download for you. Once it is downloaded to your preferred download destination, extract the files from the .zip folder into your "skyscraper" folder, (if using the patch build) replace all files when prompted, and then you are done.

Information:
This releases a major update to the Carter Building that includes the addition of LUVI'S, the first "building-within-building". The office floors have also been finished, with tenant spaces and custom ceilings added.

Poll:
Voting has closed. The winner is:
A continuation of Teknikk Plaza, which has 9 votes
« Last Edit: August 29, 2025, 07:57:53 pm by g-Elevators »
Agree Agree x 2 View List

Offline

  • Contributor Level I
  • *
  • Posts: 183
    • View Profile
Re: g-ElevIntegration
« Reply #106 on: September 01, 2025, 12:15:45 am »
I don't think I've ever seen any Teknikk Plaza builds. The only form of Teknikk I've known was on Roblox.

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #107 on: September 08, 2025, 04:47:37 pm »
I don't think I've ever seen any Teknikk Plaza builds. The only form of Teknikk I've known was on Roblox.
What I am talking about is the Teknikk Plaza building which I randomly found in the Gooper1 Data Pack.

Offline

  • Contributor Level I
  • *
  • Posts: 183
    • View Profile
Re: g-ElevIntegration
« Reply #108 on: September 08, 2025, 11:46:06 pm »
Ah, I see.

Offline

  • Contributor Level I
  • *
  • Posts: 183
    • View Profile
Re: g-ElevIntegration
« Reply #109 on: September 09, 2025, 12:40:56 am »
In that case, will we be able to vote on which building comes out next after Teknikk Plaza?

Offline

  • Contributor Level I
  • *
  • Posts: 139
    • View Profile
Re: g-ElevIntegration
« Reply #110 on: September 09, 2025, 10:56:01 am »
I would like to see a version of Cliveden - Dundalk International Airport, built from scratch.
It is incomplete and was never finished. A hotel was also supposed to be built there, but this was never started.
Agree Agree x 1 View List

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #111 on: September 12, 2025, 06:36:32 pm »
Update: September 12, 2025
Coming soon, second building!
I have just finished planning out the second building for this IP, the Palm Tree Plaza. This will be a complete from-scratch overhaul and continuation of HeisTeknikk's Teknikk Plaza, which never came out of version 1 pre-release. It will be a two-building complex, fictionally set in Miami, Florida. The first building will be the Seashell Building, which will be mixed-use. Floors 6-11 and 14-20 will be offices, while floors 22-30 and 33-40 will contain a hotel (including a lobby/pool on floor 22). Floors L and 2 will contain the main lobby and mezzanine respectively, while floors 41 and 42 will contain the observation deck and crown restaurant respectively. Mechanical floors are present on floors 12-13 and 31-32. Lastly, floors 3-5 will have meeting rooms similar to Mn10's Transnational Office Plaza. The second building will be the Sandbar Wing, which is auxiliary. This building will have offices on all of its floors (L-5) and an atrium with glass elevators. It will be connected to the Seashell Building via a skybridge on floor 2.
Pictures:
« Last Edit: September 12, 2025, 06:47:16 pm by g-Elevators »
Agree Agree x 2 View List

Offline

  • Contributor Level I
  • *
  • Posts: 135
    • View Profile
Re: g-ElevIntegration
« Reply #112 on: September 12, 2025, 10:14:17 pm »
Update: September 12, 2025
Coming soon, second building!
I have just finished planning out the second building for this IP, the Palm Tree Plaza. This will be a complete from-scratch overhaul and continuation of HeisTeknikk's Teknikk Plaza, which never came out of version 1 pre-release. It will be a two-building complex, fictionally set in Miami, Florida. The first building will be the Seashell Building, which will be mixed-use. Floors 6-11 and 14-20 will be offices, while floors 22-30 and 33-40 will contain a hotel (including a lobby/pool on floor 22). Floors L and 2 will contain the main lobby and mezzanine respectively, while floors 41 and 42 will contain the observation deck and crown restaurant respectively. Mechanical floors are present on floors 12-13 and 31-32. Lastly, floors 3-5 will have meeting rooms similar to Mn10's Transnational Office Plaza. The second building will be the Sandbar Wing, which is auxiliary. This building will have offices on all of its floors (L-5) and an atrium with glass elevators. It will be connected to the Seashell Building via a skybridge on floor 2.
Pictures:


I was wondering if you have any plans to install a parking lot or an escalator.
And I was wondering if you have any plans to apply keypad to dispatch or Service Elevator.

Offline

  • Contributor Level I
  • *
  • Posts: 183
    • View Profile
Re: g-ElevIntegration
« Reply #113 on: September 12, 2025, 11:24:03 pm »
Now THIS looks good! What brands will the elevators be?

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #114 on: September 22, 2025, 04:43:32 pm »
Now THIS looks good! What brands will the elevators be?
I am planning KONE in the office elevators, Otis in the auxiliary-building elevators, and TKE everywhere else.

Offline

  • Contributor Level I
  • *
  • Posts: 183
    • View Profile
Re: g-ElevIntegration
« Reply #115 on: September 22, 2025, 06:58:18 pm »
Neat. What sort of buttons can we expect? Unless you're still undecided, which is fine if that's the case.

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #116 on: October 09, 2025, 06:08:37 pm »
Update: October 9, 2025
Second building starting...
I have just started work on my second building for this IP, the Palm Tree Plaza. I have added the ground, flooring to both buildings, and some columns to the Seashell Building. If you haven't noticed already, I created a grid texture (similar to the one that Skyscraper Simulator Showcase uses in his buildings), to assist with wall and column placements. Next up, I will complete the column frame and start work on floors above L.
To-do (structural):
- Columns: Barely started
- Floors: Barely started
- Interfloor: Not started
- Elevators: Not started
- Stairwells: Not started
Screenshots:

« Last Edit: October 09, 2025, 06:21:06 pm by g-Elevators »
Agree Agree x 2 View List

Offline

  • Contributor Level I
  • *
  • Posts: 183
    • View Profile
Re: g-ElevIntegration
« Reply #117 on: October 09, 2025, 06:26:44 pm »
I already like how this looks.

Offline

  • General Member
  • Posts: 61
    • View Profile
Re: g-ElevIntegration
« Reply #118 on: October 11, 2025, 03:53:10 am »
Where are the screenshots on my laptop, the screenshots won't show up?

Offline

  • Contributor Level I
  • *
  • Posts: 190
    • View Profile
Re: g-ElevIntegration
« Reply #119 on: October 21, 2025, 12:39:03 am »
Update: October 21, 2025
Column frame and renumbering
I have just completed the column frame layout and added floors up to 5, including the skybridge between the two buildings on floor M. I also renumbered 2 as M (standing for mezzanine). Next up, I will finish up floors all the way to 42, and likely also start work on elevator shafts and stairwells.
To-do (structural):
- Columns: Making good progress
- Floors: Making good progress (need to add floors above 5)
- Interfloor: Started
- Elevators: Not started
- Stairwells: Not started
Screenshots: